+86 17601640209

Beijing BKC Technology Co., Ltd.

CN EN
Guiding Innovation,F cusing on Application
hot keywords:
3D Digital Handover
Smart Power Plant Solution
Smart infrastructure
Location: Home » Service Cases » "Must-test: The Case of Jingdezhen Power Plant of State Power Investment Corporation
font: Big Middle Small

"Must-test: The Case of Jingdezhen Power Plant of State Power Investment Corporation

Released Date: Sep 24,2020 Article Source: BKC Technology
2017In that year, our company successfully implemented the "Five-Inspection Integrated Intelligent Operation and Maintenance Management System" project for Jingdezhen Power Plant of State Power Investment Corporation. The project includes: visualized auxiliary machine intelligent safety pre-control system, precise diagnosis and remote equipment management system, visualized intelligent patrol inspection system, lean maintenance trigger management system, and visualized 3D model navigation system for the entire plant.

2017In that year, our company successfully implemented the "Five-Inspection Integrated Intelligent Operation and Maintenance Management System" project for Jingdezhen Power Plant of State Power Investment Corporation.

The project includes: visualized auxiliary machine intelligent safety pre-control system, precise diagnosis and remote equipment management system, visualized intelligent patrol inspection system, lean maintenance trigger management system, and visualized 3D model navigation system for the entire plant.

Jingdezhen1

(1Based on "inspection Tours, spot checks, precise spot checks, online detection, and maintenance trigger management", an integrated platform integrating work management, performance assessment, and information resource sharing is established.

(2Based on big data mining and refinement, establish artificial intelligence+Expert diagnosis knowledge base based on expert experience (or fault model database);

(3Establish a remote diagnosis and knowledge sharing interaction platform;

(4Apply 3D technology to transform training and supervision methods, and achieve 3D visualized training and condition monitoring.

(5Establish a comprehensive quality grade maintenance and maintenance trigger control system based on the lean concept.

Jingdezhen2

Jingdezhen4

Jingdezhen3

Related