"Must-test: A Case Study of the Smart Power Plant Project in Changtan, Inner Mongolia.

"Must-test: A Case Study of the Smart Power Plant Project in Changtan, Inner Mongolia.

In 2020, our company began to implement the Inner Mongolia Changtan (2×660MW) Smart Power Plant proj...
"Must-test: Implementation Case of Precision Inspection Project at Baotou No. 2 Thermal Power Plant.

"Must-test: Implementation Case of Precision Inspection Project at Baotou No. 2 Thermal Power Plant.

In order to better serve production, carry out precise inspection work and enhance the reliability o...
"Must-test: Chinalco Baotou Aluminum Industry - Baotou Aluminum Thermal Power Plant Case.

"Must-test: Chinalco Baotou Aluminum Industry - Baotou Aluminum Thermal Power Plant Case.

This project takes the full life cycle management of equipment as the main line, including functiona...
"Must-test: The case of Hebei Huadian Shijiazhuang Luhua Thermal Power.

"Must-test: The case of Hebei Huadian Shijiazhuang Luhua Thermal Power.

The "Intelligent Decision-making Platform for Optimized Maintenance" is a platform designed for equi...
"Must-test: The Case of Shanghai Huadian Fengxian Thermal Power Co., LTD.

"Must-test: The Case of Shanghai Huadian Fengxian Thermal Power Co., LTD.

This project is a major scientific and technological project of Huadian Group in 2018-2019. It is th...
"Must-test: The Case of Huadian Inner Mongolia Energy Tumote Power Generation Branch.

"Must-test: The Case of Huadian Inner Mongolia Energy Tumote Power Generation Branch.

By building intelligent subsystems including boilers, steam turbines, auxiliary machines, pipeline n...
"Must-test: The Case of Huaneng Weihai Power Generation Co., LTD.

"Must-test: The Case of Huaneng Weihai Power Generation Co., LTD.

Through the implementation of this project, the shortcomings of previous training systems, such as t...
"Must-test: The Case of Huadian Laizhou Power Generation Co., LTD.

"Must-test: The Case of Huadian Laizhou Power Generation Co., LTD.

The system ultimately achieves a three-dimensional display of the structure and working principle of...
"Must-test: The Case of Huaneng Huaiyin Second Power Generation Co., LTD.

"Must-test: The Case of Huaneng Huaiyin Second Power Generation Co., LTD.

This project integrates the management resources of equipment such as boilers, turbines and electric...
"Must-test: The Case of Huadian Zouxian Power Plant

"Must-test: The Case of Huadian Zouxian Power Plant

2014By the end of the year, Bikec completed the visualized boiler anti-wear and explosion-proof syst...