Full life cycle Full equipment The entire process Full data Fully visible
Learn more >Intelligent perception and recognition Intelligent transmission and storage
Learn more >Reliability Safety Availability Economy Environmental friendliness
Learn more >Optimize maintenance projects Optimize the maintenance cycle Optimize maintenance levels
Learn more >Institutionalization of management System process-oriented Process tabularization Table informatization
Learn more >Furnace adjustment Machine adjustment Peak shaving Frequency modulation Voltage regulation
Learn more >Based on the five-dimensional evaluation system (reliability, safety, availability, economy, and environmental protection), the "five determinations" for fault diagnosis (five determinations of fault location, cause, level, handling plan, and labor cost) and the "five optimizations" for optimized maintenance (optimizing maintenance cycle, maintenance items, maintenance level, maintenance strategy, and maintenance cost) are achieved.
Gathers researchers, engineers, mathematicians and software engineers from power, petrochemical on-site commissioning/O&M and manufacturing. With 70% of staff in R&D and domain expertise, we provide power enterprises with full-dimensional, customized solutions: optimized infrastructure design, full-life cycle O&M management, operation optimization control, and personnel health & safety management.
Good News of Winning the bid: BKC has success...
2025.03.24